Qatar Geological Mapping Project - Phase II
ACTIVITIES
Task 2 – REMOTE SENSING ELEMENTS
The objective of this WP is to develop and implement a Remote Sensing plan to acquire and process multi-modal satellite data for producing the surficial geological map of Qatar at various scales.
Task 3 - GEOLOGICAL MAPPING PROGRAM
Task-3 has been designed for the preparation of Geological Mapping of Qatar. In this context, data acquisition, processing, analysis and interpretation of all data is required.
Task 4 – SUBSURFACE INVESTIGATION PROGRAM
Lorem ipsum dolor sit amet, consec tetur adipis cing elit. Ut elit tellus, luctus nec ullam corper mattis, pulvinar dapibus.
Task 5 – DATA INTERFACE ELEMENTS
Design and implement a central Comprehensive Geoscience Data Management System (CGDMS)
Task 6 – 3D GEOLOGICAL MODEL DESIGN, DEVELOPMENT & IMPLEMENTATION
The aim of this task is to develop a 3D geologic model (or models) for the areas of greater Doha, Lusail-Al Khor, Al Wakra-Messaied
Task 7 - PREPARATION OF QGMP DELIVERABLES
Lorem ipsum dolor sit amet, consec tetur adipis cing elit. Ut elit tellus, luctus nec ullam corper mattis, pulvinar dapibus.